for accelerating urban infrastructure development. We have triumphantly
designed the first 116MW CFB hot-water boiler, the first single-layer
arranged 29MW chain boiler, and the high-temperature-water buried
pipe with diameter of DN1200, the maximum in China. And we have first
applied the large diameter noncompensated buried cold installation,
distributed frequency converting backwater pressure pumps, wholly
automatic operation of heat transfer station with no operator on duty,
and other advanced technologies. |
| |
|
| Shijiazhuang Shiguang
Heating Station Project |
| Project scale: 2×116MW+3×29MW+2×14MW. We successfully
applied the first 116MW CFB high-temperature-water boiler
in China. It has many virtues, such as large capacity, small
land occupation, high thermal efficiency, small pollution,
stable operation and low unit investment. It attracted the
attention of operators in the same field after it went into
operation in 2001. And it plays a model role in enlarging
municipal thermal source equipment in China. |
|
| |
 |
| |
|
|
Shijiazhuang
Xijiao Heating Project
3×58MW+116MW circulating fluidized bed hot water boiler |
| |
 |
| |
|
| DN1200 Large-bore
Buried Pipe Project |
| |
 |
| |
| |
|
|
| We have successively
undertaken the design for Shijiazhuang City thermal piping
network projects, with a total heating scale of 30,000,000
m2. Now we are expanding our business coverage to other cities
in Hebei Province and all over China. FINE has high reputation
among its peers in China. |
 |
| Shijiazhuang City
1996-2010 Heating Plan made up by our Institute has won the
second award of Excellent City Plans of Hebei Province. |
|
| |
| |
|