| We have accomplished the design for tens
of thermal power plants. In 1995, we first applied the 75t/h circulating
fluidized bed boiler in Hebei Province, and finished, in succession,
the design for 130t/h and 220t/h large fluidized bed boilers, with
the maximum turbine capacity reaching 50MW. We have made extraordinary
achievements in blast furnace gas remaining heat power generation,
as well as garbage incinerating power generation. For many years,
we have gained the trust of clients for rich experience, high technical
level and fine service. In addition, we are vigorous in applying the
new and high technology in our design, which has gained us evident
economic and social efficiency. |
| |
|
Xinle Nanneng Thermal Power Plant of Shijiazhuang
City
Scale: 3×75t/h+2×C12
|
| |
 |
| |
|
|
Yongtai
Thermal Power Plant of Shijiazhuang City New & Hi-Tech Zone
Scale: 4×75t/h+B6+C6+C12
It won the second award of the ministry-level excellent engineering
designs in 1998
|
| |
 |
| |
| |
|
|
| Shijiazhuang
No.1Thermal Power Plant |
Shijiazhuang
City Petroleum Refinery |
| It applies the 130t/h circulating
fluidized bed boilers made by the square water-cooling and
high-temperature separation technology, which was developed
by Tsinghua University. In 2002, it won the second award of
ministry-level excellent engineering designs. |
25MW Turbo-Generating Units |
|
| |
 |
| |
| |
|
|
| Blast Furnace Gas Remaining
Heat Power Generation Project of Shijiazhuang Steel Works
|
Gas
Boiler |
|
| |
| |
|