| No.
|
Project Name
|
Scale & Type
|
Remarks
|
| 1 |
Phase I Project of Shijiazhuang
No.1 Thermal Power Plant
|
2×35t/h (chain boiler)+2×B3
|
Went into operation in 1986
|
| 2 |
Phase II Project of Shijiazhuang
No.1 Thermal Power Plant |
2×35t/h (chain boiler)+1×C6
|
Went into operation in 1990
|
| 3 |
Phase III Project of Shijiazhuang
No.1 Thermal Power Plant
|
1×(75t/h + 35t/h) (chain boiler)
+ 1×C12
|
Went into operation in 1996
|
| 4 |
Phase III Continuous Construction
Project of Shijiazhuang No.1 Thermal Power Plant ★
|
2×75t/h (fluidized bed boiler)
+2×C6
|
Went into operation in 1998.
Won the first award of Hebei Provincial excellent designs in 2002.
|
| 5 |
Phase IV Project of Shijiazhuang
No.1 Thermal Power Plant
|
1×130t/h (fluidized bed boiler)
|
Went into operation in 2001
|
| 6 |
Phase I Project of Shijiazhuang
No.2 Thermal Power Plant★
|
5×35t/h (chain boiler) +3×B3+1×C6
|
Went into operation in 1992,
In 2002, it won the second award of ministry-level excellent designs. |
| 7 |
Phase II Project of Shijiazhuang
No.3 Thermal Power Plant
|
1×75t/h (fluidized bed boiler)
+1×C12
|
Went into operation in 1995
|
| 8 |
Phase III Project of Shijiazhuang
No.3 Thermal Power Plant
|
1×130t/h (fluidized bed boiler)
|
Went into operation in 2000
|
| 9 |
Phase I Project of Shijiazhuang
New & Hi-tech Zone Yongtai Thermal Power Plant★
|
2×75t/h (fluidized bed boiler)
+1×C6 + 1×B6
|
Went into operation in 1995,
In 1998, it won the second award of ministry-level excellent designs.
|
| 10 |
Phase II Project of Shijiazhuang
New & Hi-tech Zone Yongtai Thermal Power Plant★
|
2×75t/h (fluidized bed boiler)
+1×C12
|
Went into operation in 2000
|
| 11 |
Shijiazhuang Luancheng Thermal
Power Plant
|
3×35t/h (chain boiler) +1×B3+1×C6
|
Went into operation in 1989
|
| 12 |
Alteration and Expansion Project
of Shijiazhuang Huailu Thermal Power Plant
|
1×35t/h (fluidized bed boiler)
+1×C6
|
Went into operation in 2000
|
| 13 |
Shijiazhuang Xinle Nanneng Thermal
Power Plant
|
3×75t/h (fluidized bed boiler)
+2×C12
|
Went into operation in 2002
|
| 14 |
Shijiazhuang Xinji Thermal Power
Plant
|
3×130t/h (fluidized bed boiler)
+2×CC12+1×B12
|
Went into operation in 2003
|
| 15 |
Xinxing Chemical Carbon Black
Tail Gas Remaining Thermal Power Station of Shijiazhuang Jingxing
County
|
1×15t/h+1×N3 |
Went into operation in Oct. 2000
|
| 16 |
Technical Alteration Project
of Shijiazhuang Refinery Auxiliary Power Plant
|
B12 changed to B6
|
Went into operation in 1992
|
| 17 |
Expansion Project Shijiazhuang
Refinery Thermal Power Station |
1×130t/h (pulverized-coal boiler)
+1×C25
|
Went into operation in 2002
|
| 18 |
Shijiazhuang Steel Works Blast
Furnace Gas Remaining Thermal Power Generation Project
|
3×35t/h+2×C6 |
One boiler went into operation
in 2002.
|
| 19 |
Shijiazhuang Combined Alkali
Plant Thermal Power Station
|
2×75t/h (cyclone boiler) +2×B4
|
Went into operation in 2003
|
| 20 |
Baoding Petrochemical Works Project
|
1×35t/h (chain boiler) +1×B3
|
Went into operation in 1990
|
| 21 |
Baoding No.2 Chemical Works Thermal
Power Station
|
1×35t/h (chain boiler) +1×B3
|
Furfural and coal boiler. Went
into operation in 1992
|
| 22 |
Cangzhou Chemical Works Thermal
Power Plant
|
4×35t/h (fluidized bed boiler)
+1×B6+1×C6
|
Went into operation in 1998
|
| 23 |
Phase I Project of Tangshan Gangyao
Thermal Power Plant
|
2×75t/h (pulverized coal boiler)
+1×B12
|
Went into operation in 1990
|
| 24 |
Phase II Project of Tangshan
Gangyao Thermal Power Plant
|
1×75t/h (pulverized coal boiler)
+1×C12
|
Went into operation in 1992
|
| 25 |
Tangshan Gangyao Rubbish Burning
Thermal Power Station
|
2×350t/d fluidized bed incinerator
|
Went into operation in 2003
|
| 26 |
Feasibility Study on Thermal
Power Station of Zhangjiakou Shenghua Chemical Industrial Co., Ltd
|
3×35t/h (fluidized bed boiler)
+1×B3+1×C6
|
Approved by Hebei Provincial
Economic and Trade Committee in 2002
|
| 27 |
Gansu Linze Starch Plant Auxiliary
Thermal Power Plant
|
3×10t/h (chain boiler) +2×B0.75
|
Went into operation in 1989
|
| 28 |
Inner Mongolia Kezuozhong Banner
Fertilizer Plant Auxiliary Thermal Power Station
|
2×10t/h (fluidized bed boiler)
+1×B0.75
|
Went into operation in 1990
|
| 29 |
Henan Hui County Thermal Power
Plant (cooperative design)
|
2×220t/h (pulverized coal boiler)
+2×N50
|
Went into operation in 1998
|
| 30 |
Henan Dengfeng Aluminium Plant
Auxiliary Thermal Power Plant (cooperative design)
|
4×220t/h (pulverized coal boiler)
+4×N50
|
Went into operation in 2000
|
| 31 |
Shanxi Jinye Gujiao Coal Gangue
Power Plant |
2×220t/h (fluidized bed boiler)
+2×N50
|
Under design, going into operation
in 2004
|
| 32 |
Baijiazhuang Mine Coal Gangue
Thermal Power Plant of Shanxi Xishan Mine Bureau
|
3×220t/h (fluidized bed boiler)
+2×C50
|
Under design, going into operation
in 2004
|
| 33 |
Project Proposal on Shijiazhuang
Xijiao Rubbish Transformation Thermal Power Station
|
rubbish treatment capacity 1000t/d
|
Australian rubbish biochemical
technology is applied.
|