Main Achievements in Thermal Power Engineering

No.

Project Name

Scale & Type

Remarks

1

Phase I Project of Shijiazhuang No.1 Thermal Power Plant

2×35t/h (chain boiler)+2×B3

Went into operation in 1986

2

Phase II Project of Shijiazhuang No.1 Thermal Power Plant

2×35t/h (chain boiler)+1×C6

Went into operation in 1990

3

Phase III Project of Shijiazhuang No.1 Thermal Power Plant

1×(75t/h + 35t/h) (chain boiler) + 1×C12

Went into operation in 1996

4

Phase III Continuous Construction Project of Shijiazhuang No.1 Thermal Power Plant ★

2×75t/h (fluidized bed boiler) +2×C6

Went into operation in 1998. Won the first award of Hebei Provincial excellent designs in 2002.

5

Phase IV Project of Shijiazhuang No.1 Thermal Power Plant

1×130t/h (fluidized bed boiler)

Went into operation in 2001

6

Phase I Project of Shijiazhuang No.2 Thermal Power Plant★

5×35t/h (chain boiler) +3×B3+1×C6

Went into operation in 1992, In 2002, it won the second award of ministry-level excellent designs.

7

Phase II Project of Shijiazhuang No.3 Thermal Power Plant

1×75t/h (fluidized bed boiler) +1×C12

Went into operation in 1995

8

Phase III Project of Shijiazhuang No.3 Thermal Power Plant

1×130t/h (fluidized bed boiler)

Went into operation in 2000

9

Phase I Project of Shijiazhuang New & Hi-tech Zone Yongtai Thermal Power Plant★

2×75t/h (fluidized bed boiler) +1×C6 + 1×B6

Went into operation in 1995, In 1998, it won the second award of ministry-level excellent designs.

10

Phase II Project of Shijiazhuang New & Hi-tech Zone Yongtai Thermal Power Plant★

2×75t/h (fluidized bed boiler) +1×C12

Went into operation in 2000

11

Shijiazhuang Luancheng Thermal Power Plant

3×35t/h (chain boiler) +1×B3+1×C6

Went into operation in 1989

12

Alteration and Expansion Project of Shijiazhuang Huailu Thermal Power Plant

1×35t/h (fluidized bed boiler) +1×C6

Went into operation in 2000

13

Shijiazhuang Xinle Nanneng Thermal Power Plant

3×75t/h (fluidized bed boiler) +2×C12

Went into operation in 2002

14

Shijiazhuang Xinji Thermal Power Plant

3×130t/h (fluidized bed boiler) +2×CC12+1×B12

Went into operation in 2003

15

Xinxing Chemical Carbon Black Tail Gas Remaining Thermal Power Station of Shijiazhuang Jingxing County

1×15t/h+1×N3

Went into operation in Oct. 2000

16

Technical Alteration Project of Shijiazhuang Refinery Auxiliary Power Plant

B12 changed to B6

Went into operation in 1992

17

Expansion Project Shijiazhuang Refinery Thermal Power Station

1×130t/h (pulverized-coal boiler) +1×C25

Went into operation in 2002

18

Shijiazhuang Steel Works Blast Furnace Gas Remaining Thermal Power Generation Project

3×35t/h+2×C6

One boiler went into operation in 2002.

19

Shijiazhuang Combined Alkali Plant Thermal Power Station

2×75t/h (cyclone boiler) +2×B4

Went into operation in 2003

20

Baoding Petrochemical Works Project

1×35t/h (chain boiler) +1×B3

Went into operation in 1990

21

Baoding No.2 Chemical Works Thermal Power Station

1×35t/h (chain boiler) +1×B3

Furfural and coal boiler. Went into operation in 1992

22

Cangzhou Chemical Works Thermal Power Plant

4×35t/h (fluidized bed boiler) +1×B6+1×C6

Went into operation in 1998

23

Phase I Project of Tangshan Gangyao Thermal Power Plant

2×75t/h (pulverized coal boiler) +1×B12

Went into operation in 1990

24

Phase II Project of Tangshan Gangyao Thermal Power Plant

1×75t/h (pulverized coal boiler) +1×C12

Went into operation in 1992

25

Tangshan Gangyao Rubbish Burning Thermal Power Station

2×350t/d fluidized bed incinerator

Went into operation in 2003

26

Feasibility Study on Thermal Power Station of Zhangjiakou Shenghua Chemical Industrial Co., Ltd

3×35t/h (fluidized bed boiler) +1×B3+1×C6

Approved by Hebei Provincial Economic and Trade Committee in 2002

27

Gansu Linze Starch Plant Auxiliary Thermal Power Plant

3×10t/h (chain boiler) +2×B0.75

Went into operation in 1989

28

Inner Mongolia Kezuozhong Banner Fertilizer Plant Auxiliary Thermal Power Station

2×10t/h (fluidized bed boiler) +1×B0.75

Went into operation in 1990

29

Henan Hui County Thermal Power Plant (cooperative design)

2×220t/h (pulverized coal boiler) +2×N50

Went into operation in 1998

30

Henan Dengfeng Aluminium Plant Auxiliary Thermal Power Plant (cooperative design)

4×220t/h (pulverized coal boiler) +4×N50

Went into operation in 2000

31

Shanxi Jinye Gujiao Coal Gangue Power Plant

2×220t/h (fluidized bed boiler) +2×N50

Under design, going into operation in 2004

32

Baijiazhuang Mine Coal Gangue Thermal Power Plant of Shanxi Xishan Mine Bureau

3×220t/h (fluidized bed boiler) +2×C50

Under design, going into operation in 2004

33

Project Proposal on Shijiazhuang Xijiao Rubbish Transformation Thermal Power Station

rubbish treatment capacity 1000t/d

Australian rubbish biochemical technology is applied.