| No.
|
Project Name
|
Scale &
Type
|
Remarks
|
| 1 |
Wanlimiao Centralized Heating
Project of Shijiazhuang City
|
1×75t/h+1×35t/h (steam fluidized
bed boiler)
|
using Sweden government loan,
going into operation in 1995
|
| 2 |
Boiler Room Project of Shijiazhuang
Railway Branch Bureau No.32 living Quarters
|
2×20t/h (steam chain boiler)
|
Went into operation in 1997,
model project of Beijing Railway Bureau
|
| 3 |
Shijiazhuang City Beicheng Heating
Station
|
4×29MW (hot water chain boiler,
arranged in one storey)
|
Went into operation in 2000,
as the first set of its kind in China
|
| 4 |
Phase I Project of Shijiazhuang
City Shiguang Heating Station ★
|
2×14MW (hot water fluidized bed
boiler)
|
Went into operation in 1999,
won the second award of ministry-level excellent designs
|
| 5 |
Phase I Continuous Construction
Project of Shijiazhuang City Shiguang Heating Station
|
3×29MW (hot water fluidized bed
boiler)
|
Went into operation in 2000
|
| 6 |
Phase II Project of Shijiazhuang
City Shiguang Heating Station
|
2×116MW (hot water fluidized
bed boiler)
|
Went into operation in 2001,
as the first set of its kind in China
|
| 7 |
Phase I Project of Shijiazhuang
City Xijiao Heating Station |
2×58MW (hot water fluidized bed
boiler)
|
Went into operation in 2000
|
| 8 |
Phase II Project of Shijiazhuang
City Xijiao Heating Station
|
1×58MW+1×116MW
|
Went into operation in 2001
|
| 9 |
Chengde West Area Thermal Source
Plant Expansion Project |
1×64MW (hot water chain boiler)
|
Went into operation in 2002
|
| 10 |
Preliminary Feasibility Study
of Shijiazhuang Pingshan County Central Heating Project
|
2×29MW (hot water chain boiler)
|
Went into operation in 2002 |
| 11 |
Shijiazhuang City Government
Central Heating Western Project★
|
Heating area 2,000,000m2, 60
heat transfer stations; steam main pipe, max. dia. DN600, 16km long
|
Went into operation in 1995,
won the second award of ministry-level excellent designs
|
| 12 |
Shijiazhuang City Government
Central Heating Eastern Project★
|
Heating area 3,000,000m2, 50
heat transfer stations; steam main pipe, max. dia. DN700, 20km long
|
Went into operation in 1997,
won the first award of ministry-level excellent designs
|
| 13 |
Steam Thermal Network Project
of Yongtai Thermal Power Plant in Shijiazhuang New & Hi-tech
Area
|
Steam supply capacity 120t/h,
max. pipe dia. DN500, 8km long.
|
Went into operation in 1996
|
| 14 |
Heating Pipe Network Project
of Xingtai Dongjiao Thermal Power Plant
|
Heating area 1,500,000 m2, 20
heat transfer stations, main steam pipe, max. dia. DN500, 12km long.
|
Went into operation in 1999
|
| 15 |
High-Temperature Water Network
Project of Shijiazhuang Beicheng Heating Station
|
Heating area 2,000,000 m2, 30
heat transfer stations, buried main pipes, max. dia. DN600, 15km
long.
|
Went into operation in 2000
|
| 16 |
High-Temperature Water Network
Project of Shijiazhuang Shiguang Heating Station |
Heating area 10,000,000 m2, 70
heat transfer stations, buried main pipes, max. dia. DN1000, 35km
long.
|
Went into operation in 2000
|
| 17 |
High-Temperature Water Network
Project of Shijiazhuang Xijiao Heating Station
|
Heating area 5,000,000 m2, 60
heat transfer stations, buried main pipes, max. dia. DN900, 25km
long.
|
Went into operation in 2000
|
| 18 |
High-Temperature Water Network
Project of Shijiazhuang Huadian Heating Co.
|
Heating area 12,000,000 m2, 140
heat transfer stations, buried main pipes, max. dia. DN1200, 45km
long.
|
Thermal power to be supplied
in 2003, with buried pipe of max. dia. of its kind in China.
|
| 19 |
West Ring Steam Network Project
of Shijiazhuang Huadian Heating Co.
|
Heating area 2,000,000 m2, 42
heat transfer stations, buried main pipes, max. dia. DN700, 10km
long.
|
Under construction, going into
operation in 2003
|
| 20 |
Steam Pipe Network Project of
Shijiazhuang Liangcun Econ. & Tech. Development Zone Thermal
Power Plant
|
Steam supply capacity of 50t/h,
buried steam pipe, DN400, 2km long.
|
Went into operation in 2000
|
| 21 |
Anyang Anzhang Road Steam Thermal
Network Reconstruction Project of Henan Province
|
Buried steel-jacket pipe, DN600,
2.2km long
|
Went into operation in 2002
|
| 22 |
Central Heating Project of Shengli
Oilfield Management Bureau Base
|
Heating area 8,500,000 m2, 40
heat transfer stations, max. pipe dia. DN1000, 32km long.
|
Applying many world leading technologies,
including non-compensated buried cold installation, frequency converted
back-water pressure pump, one point pressure determination and many
points water makeup, heat transfer station with no person on duty.
It will go into operation in 2003.
|
| 23 |
Preliminary Design of Shijiazhuang
Eastern Area Central Heating Thermal Network Project★
|
Heating area of 8,000,000 m2
|
Won the second award of Hebei
Provincial excellent consultation achievements in 2001
|
| 24 |
Shijiazhuang City (1996-2010)
Municipal Heating Plan★
|
Heating area of 77,000,000 m2
|
Won the third award of Hebei
Provincial excellent plans in 1998.
|